2022

camelback ski resort

The Camelbck Ski Resort project was primarily the installation and welding of water and air pipes. It was built in a challenging landscape dominated by dirt and rock.

SINCE 2019

gordon terminal

The Gordon Terminal Project challenged us to weld oil lines, tanks, and more to rebuild and restructure. We sought to bring things up to date one weld at a time.

SINCE 2020

SHAWNEE MOUNTAIN SKI AREA

The pipe welding project at Shawnee Mountain Ski Area involved replacing several sections of corroded pipes in the resort's snowmaking system. The project was completed successfully and has improved the efficiency and reliability of the snowmaking system for their winter season.

SINCE 2019

EVS METAL

Working closely with EVS Metal has significantly helped us become more efficient with prototyping, fabrication, and production welding. All things that we can apply to any future project.

Share by: